Pru and Louis Ryan Resilience Lab Elizabeth River Project Client Elizabeth River Project Location Norfolk, VA Years 2019- Current SGA was retained as a part of a design team to develop plans for a new indoor and outdoor Resilience Laboratory for the Elizabeth River Project. The goal of the facility is to create a living […]
Paxton Creek/Cameron Street Brownfields Corridor Forming Downtown Vibrancy Client Harrisburg Redevelopment Authority Location Harrisburg, PA Years 2019-2022 SGA was hired to complete an area-wide reuse plan for the City of Harrisburg’s Redevelopment Authority for the Paxton Creek / Cameron Street Brownfields Corridor. The plan depicts an evolution of design concepts for the de-channelization of Paxton Creek […]
Cambria City Theatre Adaptive Reuse Client 1901 Church Inc. Location Johnstown, PA Years 2018 The former St. Columba Catholic Church was one of three Roman Catholic churches that were closed in 2009, the result of a five-parish consolidation in the Cambria City section of the City of Johnstown. The non-profit, 1901 Church Inc. purchased the […]
Lincoln Highway Experience Museum Expansion Site Design Client Lincoln Highway Heritage Center Corporation Location Latrobe, PA Years 2017 The Lincoln Highway Heritage Corridor (LLHC) is one of twelve special “Heritage Areas” in the Commonwealth of Pennsylvania, collectively known as “Heritage PA,” which is committed to improving operations, marketing, government relations and public advocacy for all […]
Wheeling Heritage Center Site Design Client Wheeling Heritage Corporation Location City of Wheeling, WV Years 2021 SGA was retained as a part of the team of consultants to develop preliminary concepts for a new regional economic, heritage, and tourism hub located in the Gateway District entering downtown Wheeling. The project was originally conceived of in […]
Pennsylvania German Cultural Heritage Center Strategic Development Plan Client Pennsylvania State System of Higher Education/Kutztown University Location Berks County, PA Years 2009 As a result of the completion of the Kutztown University overall Campus Master Plan, the university determined a need for a strategic development plan for the University’s Anthropology Department as a museum complex […]